The Berkley brings Ocracoke home. Encompassing nearly 3 acres, a village concept building plan combining lodging, retail, dining, event services, and community gatherings brings Ocracoke back to its origin – Silver Lake Harbor. The Berkley village would be a destination for all visitors, including the 600-700 daily passengers aboard the Ocracoke Express Ferry. Existing infrastructure includes the 6 bedroom, 5 1/2 bathroom Manor, 6 bedroom 4 bathroom Suites, the Berkley Barn wedding and event center, 13 boat slips, and water and septic to accommodate expansion. The 5,810 sq ft Manor was built by legend Sam Jones with exquisite woodworking and a flair for design. It includes 6bd/5 1/2ba, a commercial kitchen, 25 seat dining room, 4 cozy fireplaces, and was meticulously renovated in 2012. The Suites, built in 2017, contain 6br/4ba across 2,640 sq ft with a full kitchen, dining and living room. The Barn, a focal point for all celebrations in the community, weddings, and reunions, is Northeastern North Carolina’s premier wedding center and is solidly booked through 2022 and 2023. Matterport 3D tours are available for all three buildings by using the links at the end of the description. Five commercial lots encompassing +/-1.14 acres with existing water and sewer are available to be used as restaurants, retail shops, condos, or residential. There is also a waterfront lot with a working dock and 13 boat slips used by commercial fishermen, charter fishermen, and recreational boaters. Septic and water on site can accommodate nearly 40 bedrooms at 5,600 gallons per day through its 20,000 sq ft drain field. Manor: https://my.matterport.com/show/?m=q1YKGozZt8A Suites: https://my.matterport.com/show/?m=YNLmPVa7EAn Barn: https://my.matterport.com/show/?m=KxZqsx6ed7G